Power System Services Completes Vortex Tube Installation for Thames Tideway Tunnel

Introduction
At Power System Services, we’re proud to announce the successful completion of a crucial project for the Thames Tideway Tunnel ‘super sewer.’ In collaboration with the Ferrovial Laing O’Rourke JV (Tideway Central), our team delivered 55 stainless steel vortex generators and drop pipes with remarkable precision and efficiency. This achievement not only highlights our expertise in large-scale infrastructure fabrication but also strengthens our reputation as a trusted partner for critical infrastructure projects.

About the Thames Tideway Tunnel
The Thames Tideway Tunnel is a monumental project designed to intercept storm flows that currently pollute the River Thames. This super sewer will enhance water quality and reduce the environmental impact of sewage overflows, safeguarding the river for future generations. Our contribution to this iconic project focused on fabricating and delivering vortex tubes that ensure the controlled descent of effluent into the main tunnel.

Project Details
The scope of work involved manufacturing 55 vortex generators and drop pipes, with diameters ranging from 2.1m to 3.1m and a total supply length exceeding 350m. These complex fabrications required strict adherence to tight geometrical tolerances and were delivered on time and within budget. Temporary lifting and stabilizing frames were also part of the deliverables, showcasing our ability to provide end-to-end solutions.

Why This Matters
The design of the vortex tube system plays a pivotal role in controlling effluent descent at multiple sites along the Thames bank, reducing pollution and contributing to the project's overall success. This underscores the importance of precision engineering and reliable fabrication in addressing large-scale environmental challenges.

Success Breeds Opportunity
Our successful delivery has not gone unnoticed. We are excited to share that this project has led to additional contracts with Tideway joint ventures, including the fabrication of ladders, weir walls, handrailing, safety devices, and marine furniture. These opportunities reflect our commitment to quality and our ability to exceed client expectations in demanding environments.

Partnering for a Sustainable Future
The Thames Tideway Tunnel project is a testament to what can be achieved through collaboration, innovation, and precision. Power System Services is honored to have contributed to this transformative initiative, and we look forward to continuing our work on projects that make a lasting positive impact.

Conclusion
Our work on the vortex tubes for the Thames Tideway Tunnel demonstrates our ability to deliver complex, high-quality infrastructure solutions. As we take on new challenges, we remain dedicated to advancing engineering excellence and supporting projects that benefit both our clients and the environment.


Partner with Us for Your Next Infrastructure Project

At Power System Services, we specialise in delivering high-quality, precision-engineered solutions for complex projects like the Thames Tideway Tunnel. Whether you need bespoke fabrications, structural components, or expert manufacturing services, our team is ready to support you.

Contact us today to discuss your project requirements and learn how we can bring your vision to life.

Phone +44 (0)1246 268 800
Email info@pss-uk.com

Previous
Previous

Power System Services: CNC Machining for Satellite Maintenance Platform Components

Next
Next

Excited to Share Our Aerospace Project: Fabricating 316L Stainless Steel Testing Components