1994
POWER SYSTEM SERVICES (PSS) ESTABLISHED
John Beauchamp founds Power System Services (PSS), initially operating from his home and later from a small unit in Bakewell, Derbyshire. Leveraging his expertise in providing high-quality goods to coal-fired power stations, John begins supplying imported Air Preheater Baskets and seals to various UK generating sites. PSS also starts providing site services for overhauling Air Preheaters at Drax Power Station.
-
1998
GROWTH
John’s son, Paul, joins the business, and together they purchase a small fabrication workshop in Chesterfield, Derbyshire. This becomes PSS's first official headquarters. The company experiences steady growth by focusing on delivering quality products and services.
-
2003
EXPANSION
PSS purchases the last surviving UK production line from TEI Green, allowing the company to manufacture high-quality heat exchanger baskets instead of relying on imported products. PSS also begins offering engineering services to other sectors, such as food production and aluminum smelting, handling projects across the UK, Pakistan, Korea, Ireland, Cyprus, and the USA. These services include conveyor system manufacturing, plant relocation, and maintenance projects.
-
2010
INCREASING OUR SCOPE:
PSS invests in a new 34,000 sq. ft. facility to support continued growth in both its product and service sectors. The additional space enhances steel fabrication capabilities, regenerative Airheater basket production, and site services. This investment solidifies PSS's reputation for quality, flexibility, and expertise.
-
2011
INTRODUCING LASER CUTTING SERVICES:
PSS expands its capabilities by acquiring a laser cutting machine, leading to the establishment of Power System Laser Cutting Services in Chesterfield.
-
2012
OUR LARGEST PROJECT TO DATE:
PSS completes its biggest project yet, the installation of an HRSG boiler at the Saica Paper Plant in Manchester. The project involves high-pressure pipework welding and is successfully delivered on time.
-
2013
CONTRIBUTING TO LONDONS INFRASTRUCTURE
PSS enters the UK infrastructure market, manufacturing and installing steelwork for the Crossrail project. The company supplies crucial tunnel support steelwork, grouting stations, and other access improvements.
-
2014
CAPITAL INVESTMENT
PSS enhances its structural steelwork capacity with a significant investment in a CNC drilling line at the Carrwood Site. This improves production speed and quality.
-
2015
FIRST PROJECT FOR LONDON UNDERGROUND
PSS manufactures and supplies the TBM launch system for the Northern Line Extension.
-
2016
ELECTRICITY SUBSTATION WORK
PSS begins manufacturing and installing HV equipment and supporting steelwork for several sites, expanding its offerings to include installation services for HV equipment.
-
2017
ENTERING THE CEMENT INDUSTRY
PSS takes on its first major project in the cement industry, completing a system installation at the Dagenham Distribution Depot. The project includes train unloading, bulk storage, bagging, and palletizing plants. The company also begins offering shutdown support services for cement plants. -
2018
BIOMASS HANDLING
PSS installs bulk intake pneumatic handling equipment at Lynemouth Power Station. This project involves the installation of free-issue parts, bridges, silo hoppers, and structural steelwork.
-
2019
INTERNATIONAL SITE WORK
PSS completes the refurbishment and reinstatement of mothballed smelting cells at Aldel Aluminium in the Netherlands.
-
2019
THAMES TIDEWAY WORKS
PSS is awarded the first of 26 major VORTEX drop pipes for the Thames Tideway Tunnel project, responsible for diverting stormwater from London sewers.
-
2019
FURTHER GROWTH
Stephen Makepeace joins PSS as General Manager, strengthening the management team. This new structure includes design, detailing, and specialist project management functions.
-
2020
EXPANSION IN THAMES TIDEWAY WORKS
PSS is awarded an additional 10 large-diameter stainless steel VORTEX drop pipes for the Thames Tideway Tunnel, thanks to the success of the first installation.
-
2020
HISTORIC ENGLAND PROJECT
PSS designs, manufactures, and installs pedestrian access beneath HMS Victory, making this previously inaccessible area available to the public.
-
2020
MEICA STEELWORK FOR TIDEWAY
PSS is entrusted with a project to produce MEICA (Mechanical, Electrical, Instrumentation, Control, and Automation) steelwork for the Tideway project. This includes ladders, hatches, weir walls, and abrasion-resistant components.
-
2021
MAJOR CEMENT INDUSTRY PROJECT
PSS is awarded a significant project to design and install a bypass system to clean emissions at the Lafarge Cauldon Cement Plant. This project marks a key post-COVID milestone.
-
2022
CNC MACHINING CAPABILITIES
PSS acquires CNC milling and turning machinery, allowing the company to expand its internal manufacturing capabilities and offer external component production services.
-
2022
TEMPORARY WORKS FOR TUNNELING
PSS is awarded the contract to manufacture temporary works waler beams for the Silvertown Tunnel project.
-
2023
NEW HIGH-POWER LASER CUTTING
PSS purchases a new 10kw fiber laser to increase its production capacity and scope for profile cutting.