The Opportunity

As part of the UK’s drive toward a lower-carbon power generation future, the owners of Lynemouth Power Station decided to retrofit the existing coal-firing boilers to burn biomass, largely imported from America and Canada. These retrofit works had two main work zones: firstly, the new fuel intake, storage, and feed to the power station, and secondly, the retrofit of generating assets to operate with the new renewable fuel.

Power System Services were awarded the contract by Sir Robert McAlpine to install mechanical handling and pneumatic conveying equipment from the intermediate silos to the mill infeed locations. This scope included the following key construction items, which were a combination of free-issue and manufactured parts:

  • Intermediate Silo Distribution Systems:
    Twelve intermediate silo distribution systems, each comprising support steelwork, two screw conveyors, two hoppers, valves, chutes, and bolt-on safety and control equipment.

  • Blower Compressors:
    Twelve blower compressors, complete with pipework feeds to the underside of the dispense system, designed to pick up biomass and blow it into the power station.

  • Pneumatic Conveying Pipelines:
    Twelve pneumatic conveying pipelines for transporting the product from the intermediate silos to the mill feeds.

  • Pipe Bridge and Trestles:
    Manufacture and installation of a pipe bridge and trestles to support conveying pipework and provide pedestrian access from the new fuel intake and handling site to the power station.

  • Pipe Support Bridge:
    Manufacture and installation of a pipe support bridge within the power station’s mill feed building, from which the 12 conveying pipes branch off to the mill feeds for all three units.

  • Mill Feed Systems:
    Installation of 12 mill feed systems, each including a steel structure (manufactured by PSS under a separate contract), screw conveyor, two hoppers, valves, filters, and bolt-on safety and control equipment.

    The breadth of in-house knowledge at Power System Services, combined with a strong reference from the equipment OEM and familiarity with both construction sites and power-generating facilities, was a key factor in the client’s award decision. Naturally, the competitiveness of our offer also played an important role.


The Solution

Power System Services deployed an experienced, well trained team to site who had a wealth of experience in construction and overhaul. The challenges faced during construction were immense not least because access and logistics to even get equipment to the construction areas with other contractors needing to operate in the vicinity were very difficult. Nevertheless, the works were phased in such a way that our contract was executed on time and without too much disruption to others.

Power System Services were commended on;

  1. Attention to safety.

  2. Quality of Workmanship. (highlighted by 100% weld and pressure test pass rate)

  3. Attention to detail and problem/ issue solving.

  4. Prepared to work outside of usual working hours to accommodate others.

  5. Timely execution of the works.

  6. Team player.

Ensure project success with our precision-engineered solutions.

Contact Power System Solutions today to discuss your next challenge.

Phone +44 (0)1246 268 800 or Email info@pss-uk.com

Previous
Previous

Crossrail

Next
Next

Lynemouth Silo Hoppers