The Opportunity
As part of a new investment scheme in aluminum smelting at the Aldel site, the client and investors decided to upgrade and reinstate Potline 1 to operate in parallel with the currently active Potline 2, significantly increasing aluminum output. Potline 1 had been mothballed for many years due to the reduced competitiveness of the site. Therefore, the work required to bring a section of 120 cells in Potline 1 back into operational status represented a significant challenge for all involved.
Aldel awarded Power System Services the contract to install and overhaul dense phase feed systems and the structures that regulate flow into the pots. This work included the following key elements, fundamental to an automated smelting operation, consisting of both free-issue and manufactured parts:
Manufacture and installation of new pipe inserts for dense-phase flow.
Manufacture and installation of a combination of new and existing asset pipework.
Repair and resealing of all joints.
Overhaul and modification of turbo bin alumina feeds (two per cell).
Removal, inspection, overhaul, and reinstallation of feed bins.
Overhaul of crust breakers.
Overhaul of gearboxes and motors.
Manufacture of start-up conductors from aluminum.
Installation of pneumatic control pipework.
The in-house expertise at Power System Services, strong references from previous contracts with certain engineers at Aldel, and familiarity with aluminum smelting facilities were key factors in the client’s decision to award us the contract. Naturally, the competitiveness of our offer also played a significant role.
The Solution
Power System Services deployed a highly skilled team to the site, bringing extensive experience from similar projects and overhauls. The challenges faced were significant, particularly with access and logistics for transporting equipment to the construction areas. These challenges were compounded by the presence of other contractors operating in the vicinity and the adjacent live smelter. Despite these obstacles, the work was phased effectively, enabling us to complete the project on time, without incidents, and to a high standard of workmanship.
Power System Services were commended for:
Attention to Safety
Quality of Workmanship
Attention to Detail and Problem-Solving
Consideration of Site-Specific Safety Systems
Flexibility to Work Outside of Usual Hours to Accommodate Others
Timely Execution of Works
Teamwork and Cooperation with Other Contractors
Ensure project success with our precision-engineered solutions.
Contact Power System Solutions today to discuss your next challenge.
Phone +44 (0)1246 268 800 or Email info@pss-uk.com