Dense Phase and Pot Cell Pneumatic Conveying Feed system and Pot Line structure Improvements and Repair
Customer: Damco Aluminium, Holland
Year of contract: 2018 – 2019
Value: £1.5m
Site: Aldel Aluminium (Damco) Delfzijl Holland
The Opportunity
As part of a new investment scheme in Aluminium Smelting at the Aldel Site, the client and the investors made the decision to upgrade and reinstate Pot line 1 to run in parallel with the currently operating Potline 2, to significantly increase Aluminium output. Potline 1 had been mothballed for many years due to the reduced competitiveness of this site, therefor the resulting work to bring a section of 120 cells in that potline back into an operational state, represented a significant challenge to all.
Aldel awarded Power System Services the contract by to install and overhaul Dense Phase feed systems and the structures that regulate flow into the Pots. This work involved the following key elements fundamental to an automated Smelting operation that were a combination of free issue and manufactured parts;
- Manufacture and installation of new pipe inserts for dense phase flow.
- Manufacture and installation of a combination of new and existing asset pipework.
- Making good all joints and re-sealing.
- Overhaul and modification of Turbo bin alumna feeds (2 per cell).
- Removal inspection overhaul and reinstallation of feed bins.
- Overhaul of Crust breakers.
- Overhaul of Gearboxes and Motors.
- Manufacture of start-up conductors from Aluminium.
- Pneumatic control pipework.
The breadth of knowledge in house at Power Systems, a good reference from previous contracts with certain engineers at Aldel, plus and the fact that Power System Services are familiar with Aluminium Smelting facilities was a key consideration in the clients award criteria, coupled naturally with the competitiveness of our offer.
The Solution
Power System Services deployed a well-trained team to site who had a wealth of experience in similar projects and overhaul. The challenges faced during significant not least because access and logistics to even get equipment to the construction areas with other contractors needing to operate in the vicinity and of course the adjacent live smelter were very difficult. Nevertheless the works were phased in such a way that our works were executed on time, without any incidents and to a high quality of workmanship.
Power System Services were commended on;
- Attention to safety.
- Quality of Workmanship.
- Attention to detail and problem/ issue solving.
- Site specific safety from the system considerations.
- Prepared to work outside of usual working hours to accommodate others.
- Timely execution of the works.
- Team player.
- Cooperation with other works as required.
Blowers and Pipework Feeds
Power System services as installation contractor on this project worked with the client with a Common goal, helping develop specifications and inventory lists for maintenance and future needs, whilst understanding budget constraints.
The project was concluded safely, profitably, on time and to the specified standards. We took an active role in the Design and buildability process throughout and assisted with other large scale projects on the same site whilst this contract was being undertaken, not least in the Cast house and live potline 2.